Next spring, a new legal duty is expected to start applying to thousands of businesses across the UK. The Terrorism (Protection of Premises) Act 2025, better known as Martyn’s Law after Martyn Hett, who was killed in the Manchester Arena attack in 2017, will require the people responsible for many public venues and events to plan for how they would protect people if an attack happened.

The government has promised an implementation period of at least 24 months, and active regulation is expected from spring 2027. Final statutory guidance was published in April, and the Security Industry Authority, which will regulate the new regime, has consulted on how it intends to enforce it. Yet outside the large stadiums and arenas, plenty of hotels, conference venues, shopping centres, theatres and visitor attractions have barely looked at it.

Who Is Covered

The law works on capacity. Premises where 200 to 799 people could reasonably be expected to be present at once fall into the standard tier. Those with a capacity of 800 or more, and qualifying events of that size, fall into the enhanced tier. Capacity counts staff as well as the public, which catches out some businesses that only think in terms of visitors.

For the standard tier, the duty is mainly about procedures. Owners and operators need clear plans for evacuation, invacuation (bringing people inside to safety), lockdown and communicating with people on site, and must notify the regulator that they are responsible for the premises. The enhanced tier goes further, requiring physical measures to reduce the risk and the harm, a documented assessment of how those measures work, and a named senior individual where the responsible person is an organisation.

For many firms, the sensible first step is an honest look at how their building actually works, rather than how the floor plan says it should. Independent security services such as site surveys and physical risk assessments can show where the gaps are, from doors that are routinely propped open to a reception desk that cannot see the main entrance, before the regulator or an incident does.

The Penalties Are Real

The regime is not designed to catch out well-meaning businesses, and the SIA has said it will focus on advice and support first. But it will have teeth. Standard tier premises that fail to comply with a notice face penalties of up to £10,000. For the enhanced tier, the maximum is the greater of £18 million or 5% of worldwide revenue.

The bigger risk for most businesses is not the fine. It is finding out on the worst day imaginable that staff did not know what to do, that exits were blocked or that nobody could lock the building down.

Procedures First, Then Physical Measures

Much of what the standard tier asks for costs little more than time. Work out where people would go in an evacuation and where they would shelter if leaving were more dangerous than staying. Decide how a lockdown would be triggered and who would do it. Agree how messages would reach staff and visitors quickly, whether by public address, radio or a simple phone tree. Then write it down and make sure the people on shift actually know it.

Enhanced tier premises need to look harder at the building itself. That can mean controlling vehicle access, rethinking entrances and queues, improving CCTV coverage of key areas and making sure internal doors can be secured. Crime prevention through environmental design, which uses layout, sightlines and landscaping to make attacks harder and easier to spot, often achieves more than adding equipment.

Where to Start This Winter

Check your capacity honestly, including staff, and work out which tier you fall into. Read the government’s statutory guidance, which is written for business owners rather than lawyers. Talk to neighbouring premises and landlords, because the law expects coordination where buildings share space or access. And build Martyn’s Law into the security planning you already do for theft, fire and business continuity, rather than treating it as a separate box to tick.

Spring 2027 is closer than it looks. Businesses that start now will have time to plan, train their staff and fix what needs fixing. Those that wait will be doing it in a rush, with the regulator already watching.